LEX News

Prairie Lakes Healthcare Installs Lumetta Lighting in Key Areas for Design and Ambiance

Prairie Lakes HealthCare in Watertown, SD was looking to update and modernize their reception, lunch, and conversation areas and to better utilize their existing space. Lighting was given a top priority, not only for the sake of practicality, but also for aesthetic effects. The ambient lighting would serve as both a welcoming and comforting atmosphere for patients and visitors alike. The soft lighting would also give a feel of stability and permanency to the facilities. Ultimately, the hospital chose Lumetta to design and fabricate the fixtures for each of the locations.


Kirlin Delivers Quality Light for Healthy Outcomes at NJ Behavioral Facility

St. Clare’s Hospital in Denville, New Jersey converted a medical-surgical floor to a much-needed behavioral health unit for adolescents and adults. Posen Architects was chosen to design a treatment center which would reduce the risk for self-harm, deter contraband concealment, and maintain a residential feel.


Light Without Boundaries Meets the Center of Gravity

A Mixed-Use Development that is the central destination in a vibrant arts district adjacent to downtown Columbus offering a live-work-play campus with a rich program of amenities.


Simplot HQ Shines a Light on the Human Experience

Lighting Control Management. Branch specified the lighting and shading manufacturer Lutron, a company widely known for its leadership and innovations in human-centric lighting. “Lutron’s system manages the sensors, automated shades, digital ballasts, and LED drivers into a seamless experience,” Branch says. “Lutron is always at the forefront of lighting technology.


Targetti Delivers a Beautiful Contribution to the Boston Logan Airport, Terminal B

Collaborative Lighting, LLC recently was awarded an IES Section award for the lighting design of Logan Airport Terminal B renovation.  The new “Great Hall” in the Boston’s Logan Airport  terminal was part of the nearly $200 million Terminal B Optimization project which took a year-and-a-half to complete.